Task window
Windows used with tasks:
The editor window is opened by the one or more tasks are selected.
command in the context menu whenEditor window
If one task is selected, the
window will open.The window contains Properties and Schedule panels.
Properties panel fields:
-
Name — name of the task.
-
Task type — task type that the task belongs to.
-
employee who added the task.
— user name of the -
Filter parameters — filter parameter panels representing filter steps for the selected task type.
-
Inactive — allows the task to be temporarily deactivated.
The value is selected from No or Yes.
-
Description — brief description.
-
Security category — security category assigned to the task.
Select
to save changes and close the window. Select to save changes without closing the window. Select to close the window without saving changes.The fields and panels are the same as in the window.
Multiple editor window
When two or more tasks are selected for editing, the multiple tasks editor window will open. It has a panel displaying a list of the selected tasks. The Filter parameters field is not displayed.
When multiple tasks are selected for editing, any changes that are saved will be applied to all of the selected tasks.
The fields and panels are the same as in the window.
Entry window
The
entry window is opened by the command from the context menu.
The fields and panels are the same as in the window.
Schedule panel in the Task window
The Schedule panel is used to configure the schedule for running the task.
Data grid columns:
-
Task — name of the task.
-
Schedule type — type of schedule used to launch the task.
-
Inactive — whether the schedule is temporarily deactivated.
Context menu commands:
-
— add a new schedule.
-
— edit a selected schedule.
Attention
Only one schedule can be edited at a time.
-
— permanently delete selected schedule.
-
— print out.
- — contains additional commands for
The
and windows are used for adding and editing schedules.The permanent delete confirmation prompt is used when deleting schedules.