Schedule limits panel in the Schedule window
Schedule limits panel in the Schedule window

The Schedule limits panel is used to specify the start and end dates of the task schedule’s validity.

Figure 10.136. Schedule limits panel


The Schedule limits panel is composed of the following fields:

  • Start date is the start date of the task schedule validity. This is a required field.

  • End date is the end date of the task schedule validity.