Special day window
Windows used with special days (days configured for specific dates):
-
and editor windows,
-
entry window.
The editor window is opened by the
command in the context menu when one or more special days are selected.Any period in future can be set up as a special day. The corresponding special day setting will be applied only during this period.
If one special day is selected, the
editor window will open.Window fields:
-
Division — the division in which the special day applies. Required field.
-
Day type — day type. Required field.
-
Start date — date and time when the special day period starts. Required field.
-
End date — date and time when the special day period ends. Required field.
Selecting
will add the item to the directory and close the entry window. Selecting will close the window without saving the item. Selecting will add the item to the directory without closing the window.The
editor window opens when multiple day type settings are selected for editing.The multiple day type settings window contains a panel with a list of the selected day type settings.
The
entry window is opened by the command from the context menu.
The fields are the same as in the
editor window.Note
Only one special day setting can be created for a period (a weekday). On attempting to create another special day setting for a period that already has a special day setting, the error message will be displayed: